Planned interruption for week 18

ID: 
1388

Due to an upgrade of the link LANNION-TOULOUSE on 20170503 at 0800UTC, some products may be transmitted with delay.

METOP-B manoeuvre planned on 20170503 at 1239UTC: Quality of geo-location may be temporarily degraded after the maneuver. Impacted products : MGR SST, METOP NAR SST, IASI SST and GLB SST.