Planned interruption for week 26

ID: 
1629

Due to IASI Instrument decontamination on Metop-B planned between 20180627 at 0700UTC and 20180702 at 1500UTC,  no production during this period

Impacted product:

[OSI-208-b] Infrared Atmospheric Sounding Interferometer Sea Surface Temperature