Planned interruption for week 27

ID: 
1631

Due to IASI Instrument decontamination on Metop-B planned between 20180627 at 0700UTC and 20180702 at 1500UTC,  no production during this period
Due to IASI external calibration on Metop-B on 2018/07/05 from 0512UTC to 0912UTC, no production during this period.

Impacted product:
[OSI-208-b] Infrared Atmospheric Sounding Interferometer Sea Surface Temperature [1]