Planned interruption for week 35

ID: 
1655

Due to IASI instrument calibration (lunar intrusion) on METOP-B from 20180830 at 1652UTC to
20180831 at 2112UTC, short interruptions can be expected .

Due to IASI instrument calibration on METOP-B on 20180901 from 0512UTC to
0912UTC, no production during this period.
Impacted product : Infrared Atmospheric Sounding Interferometer Sea Surface Temperature

Due to a problem on the goes16 cloud mask of 12UTC, sometimes the GOES-E  SST (OSI-207)  could be missing.  Ongoing investigation.