Planned interruption for week 37

ID: 
1445

Due to IASI External Calibration (Moon Intrusion) from  20170910 at 0032UTC to 20170911 at 0259UTC short interruptions can be expected on the
production of IASI SST.

METOP-B manoeuvre planned on 20170913  at 1212UTC: Quality of geo-location may be temporarily degraded after the maneuver. Impacted products : MGR SST, METOP NAR SST, IASI SST and GLB SST.