Planned interruption for week 38

ID: 
1918

Due to IASI External instrument calibration on Metop-B from 2019-09-18T12:34Z to 2019-09-19T12:13Z, there will be no OSI SAF IASI SST production during this period.

Impacted product:

 [OSI-208-b] Infrared Atmospheric Sounding Interferometer Sea Surface Temperature