Planned interruption for week 48

ID: 
1703

Due to IASI (External ) instrument calibration on Metop-B from 2018-11-27T05:12Z to 09:12Z, there will be no OSI SAF IASI SST production during this period.

Impacted product:

[OSI-208-b] Infrared Atmospheric Sounding Interferometer Sea Surface Temperature