Planned interruption for week 50

ID: 
1980

Due to IASI External instrument calibration on Metop-B from 2019-12-09T05:12Z to 09:12Z and from 2019-12-12T08:56Z to 13:05Z, there will be no OSI SAF IASI SST production during this period.

Impacted product:

 [OSI-208-b] Infrared Atmospheric Sounding Interferometer Sea Surface Temperature