sea surface temp. and radiative fluxes

Planned interruption for week 30

None foreseen.

Cécile Hernandez's picture

OSI SAF demonstration products over Indian Ocean

Dear OSI SAF user,
 

Planned interruption for week 28

S-NPP manoeuvre the  20170711  from 1710UTC to 1717UTC, products will be unavailable or degraded after this maneuver : S-NPP NARSST.

Planned interruption for week 26

None foreseen.

Planned interruption for week 25

Due to IASI instrument calibration on METOP-B on  20170623 from 0512UTC to 0912UTC, no production of IASI SST during this period.

Planned interruption for week 24

none foreseen.

Planned interruption for week 23

None foreseen.

Planned interruption for week 22

None foreseen.

Planned interruption for week 21

Meteosat10 manoeuver planned on 20170522 at 1506UTC: products may be temporarily degraded after the maneuver.

Impacted products : METEOSAT SST, DLI and SSI.

 

Planned interruption for week 20

Due to a maintenance in the Eumetcast system on 20170518 to 0800UTC from 1100UTC: products may be temporarily delayed during this operation.

 

Pages

Subscribe to RSS - sea surface temp. and radiative fluxes