Planned interruption for week 39

None foreseen.

Planned interruption for week 38

Due to IASI instrument external calibration on METOP-B on 20170918 from 0512UTC to 0912UTC, no production during this period.

Planned interruption for week 37 bis

 

in correction of the previous message

METOP-B maneuver planned on 20170913  at 1212UTC:  No IASI data from 0736 to 1330UTC.

Planned interruption for week 37

Due to IASI External Calibration (Moon Intrusion) from  20170910 at 0032UTC to 20170911 at 0259UTC short interruptions can be expected on the
production of IASI SST.

Planned interruption for week 36

Due to IASI External Calibration (Moon Intrusion) from  20170910 at 0032UTC to 20170911 at 0259UTC short interruptions can be expected on the
production of IASI SST.

 

Planned interruption for week 35

Meteosat08 manoeuvre planned on 20170830at 0013UTC: products may be temporarily degraded after the maneuver.

Impacted products :

Planned interruption for week 34

None foreseen.

Planned interruption for week 33

Due to IASI instrument calibration on METOP-B on 20170820 from 0512UTC to 0912UTC, no production during this period.

Impacted product :

Planned interruption for week 32

None foreseen.

Planned interruption for week 31

Due to IASI calibration on METOP-B, some interruptions can be expected from 20170802 at 0800UTC to 1500UTC.

Impacted product :