sea surface temp. and radiative fluxes

Planned interruption for week 21

Due to IASI external instrument calibration on Metop-B from
2019-05-20T05:12Z to 09:12Z, there will be no OSI SAF IASI SST production during this period.

Impacted product:

Planned interruption for week 21

Due to IASI external instrument calibration on Metop-B from
2019-05-20T05:12Z to 09:12Z, there will be no OSI SAF IASI SST production during this period.

Impacted product:

Problems with some Low and Mid-Latitude SST and Flux production on 2019-05-13

Due to problems on transmission systems at Météo-France production centre, generating lack of input data, several OSI SAF products have not been produced and others have been delayed on 2019-05-13.

Planned interruption for week 20

None Foreseen.

Planned interruption for week 19

None foreseen

 

Planned interruption for week 18

None foreseen

Cécile Hernandez's picture

Problems with some Low and Mid-Latitude SST and Flux production on 2019-04-24

Due to problems on transmission systems at Météo-France production centre, generating lack of input data, several OSI SAF products have not been produced and others have been delayed on 2019-04-2

Planned interruption for week 17

Meteosat-8 manoeuvre planned on 2019-04-24T03:43Z. Products may be temporarily degraded after the manoeuvre.

Impacted products:

Planned interruption for week 16

Due to IASI external instrument calibration on Metop-B from 2019-04-21T05:12Z to 09:12Z, there will be no OSI SAF IASI SST production during this period.

Planned interruption for week 15

Due to eclipse season on Meteosat-11 between 30 March and 07 April, there is a risk of degraded image quality from 0000UTC to 0100UTC.
Impacted products:

Pages

Subscribe to RSS - sea surface temp. and radiative fluxes