sea surface temp. and radiative fluxes

Planned interruption for week 2

Due to IASI instrument calibration on METOP-B on 20180112 from 0512UTC to 0912UTC, no production during this period.

Impacted product :

Planned interruption for week 1

Due to IASI instrument calibration on METOP-B  from 20180105 at 0523UTC to 20180106 at 0750UTC, no production during this period.

Impacted product :

Resumption of GOES data

GOES data production resumed on 2017/12/25 at 07h45UTC.

 

Interruption of GOES data

Due to an outage of the satellite GOES data have been unavailable since today 2017/12/25 at 0600UTC.

Resumption of GOES data

GOES data production resumed on 2017/12/24 at 15h45UTC.

 

Interruption of GOES data

Due to an outage of the satellite GOES data have been unavailable since today 2017/12/24 at 1400UTC.

Impacted products :

Planned interruption for week 52

METOP-B
Due to IASI external calibration on Metop-B on 2017/12/26 from 0512UTC to 0912UTC, no production during this period.
Impacted products :

Resumption of GOES data

GOES data production resumed on 2017/12/21 at 0600UTC.

Due to a problem with GOES-E  data reception, some products were unavailable since 2017/12/20/1200UTC.

Produits impacted:

Interruption of GOES data

Due to a problem with data reception, some GOES-E data are late or unavailable since 2017/12/20/12h00UTC.
Produits impacted: hourly GOES SST and FLUXES may be unavailable.

Planned interruption for week 51

None foreseen.

Pages

Subscribe to RSS - sea surface temp. and radiative fluxes